The FA

The FA

(Scroll down)

Client

The FA

Date

January 2024

Services

Mechanical and Electrical

Preparing the England team for Euro 2024, our M&E expertise powered a café refurbishment, delivered with efficiency, precision, & performance in every detail.

Preparing the England team for Euro 2024, our M&E expertise powered a café refurbishment, delivered with efficiency, precision, & performance in every detail.

Preparing the England team for Euro 2024, our M&E expertise powered a café refurbishment, delivered with efficiency, precision, & performance in every detail.

Preparing for Euro 2024, the FA required a fast-tracked refurbishment of the Dug Out café at St George’s Park, England’s elite training base and the heart of national football development. Our M&E team delivered a full package of works, from power and data for kitchen systems to LED lighting upgrades, extract ventilation, and essential infrastructure enhancements. With tight deadlines and no room for delay, we worked evenings and weekends to keep the programme on track. Every system was installed with precision and purpose, ensuring seamless integration into a high-traffic hospitality setting. As England powered through to the final, our behind-the-scenes contribution supported the world-class facilities they relied on daily. A standout project delivered under pressure, with professionalism and pride.

Related Stories

Read about our latest updates.

Close up shot of product

Subway. Fresh, fast, and flawlessly delivered by our expert team across the UK.

Subway. Fresh, fast, and flawlessly delivered by our expert team across the UK.

Man wearing smart watch

Oswestry College. A vibrant, functional space designed to enhance student life on campus.

Oswestry College. A vibrant, functional space designed to enhance student life on campus.